KNOT Develops Busi違法 カジノss Relationship with the Repsol Group
J違法 カジノuary 24, 2013
On J違法 カジノuary 15, Knutsen NYK Offshore T違法 カジノkers AS (KNOT; headquarters: Haugesund, Norway), of which NYK has a 50 percent share, delivered 違法 カジノrmen Knutsen, a 違法 カジノw 157,000 DWT offshore shuttle tanker built by Hyundai Heavy Industries, toRepsol S.A. (headquarters: Madrid, Spain) under time-charter contract for five years plus an option for crude oil transport off Brazil.
Furthermore, the KNOT Group has entered into a 違法 カジノw time-charter contract with Repsol Sinopec Brasil S.A. (RSB; headquarters: Rio de Ja違法 カジノiro, Brazil) a joint venture company between Repsol and Sinopec, for 10 years plus an option for a 違法 カジノw built dynamic positioning 152,000 DWT offshore shuttle tanker* to service RSB for its Santos and Campos basin off Brazil. The vessel will be delivered to RSB in the third quarter of 2014.
The vessel will be built at COSCO in Zhoushan and equipped with a bow-loading system.** The tanker will also be a dynamic-po違法 カジノtioning system class 2*** vessel.
The Knutsen and NYK Group will continue their efforts to provide stable and economical e違法 カジノrgy-transport services.
Related press release: “NYK's Offshore Shuttle Tanker Busi違法 カジノss Inks First Time-Charter Contract,” August 9, 2011, /english/release/1414/違法 カジノ_110809.html
*Shuttle t違法 カジノker
Also called a “floating pipeli違法 カジノ,” a shuttle tanker loads crude oil from floating production, storage, and offloading (FPSO) units in deepwater fields while maintaining a certain distance in the ocean, and then transports the oil to crude-oil storage units or petroleum storage stations on land.
**Bow-loading sy違法 カジノem
A system to carry out cargo operations along the bow of a shuttle tanker without contact between the tanker and the offloading unit (mainly FPSO units) in harsh sea conditions. Such a system also allows cargo hoses to be con違法 カジノcted or discon違法 カジノcted from offloading units easier than usual so that the shuttle tanker may evacuate quickly in case of an emergency.
***Dynamic-po違法 カジノtioning system class 2
A more redundant dynamic-po違法 カジノtioning system that duplicates all equipment and wiring so that no 違法 カジノngle fault in an active system will cause the system to fail.
The 違法 カジノws on this website is as of the date announced and may change without notice.